Overseas customers often ask: “If I decide to buy a fiber optic cable production line from you, what happens next?”
That’s a good question. Many overseas buyers purchasing Chinese equipment for the first time don’t know what the process looks like, what to do at each stage, or what the supplier should provide. Today, let’s walk through the complete process from inquiry to production, so overseas buyers know what to expect.

Stage 1: Inquiry and Requirement Confirmation – First, Clarify “What You Want”
Time: 1 to 5 working days
It all starts with an inquiry. Overseas customers contact Hongkai via email, WhatsApp, or the website. The first sentence is usually: “I need a cable production line. Please quote.”
But quoting directly is irresponsible. Because the configuration of an optical fiber cable production line depends on three things:
-
What type of cable will you make? Loose-tube outdoor cable, FTTH butterfly drop cable, or indoor cable? This determines which combination you need: fiber coloring machine, secondary coating line for optical fiber, SZ stranding line, or fiber optic cable sheathing line.
-
Where will the factory be built? Voltage system, certification requirements, shipping routes – conditions differ by country.
-
What is the approximate capacity? How many kilometers per month or per year? This determines equipment quantity and speed configuration.
Hongkai’s technical team confirms these three things with the customer after receiving the inquiry. Then, within 5 working days, we provide a preliminary equipment configuration proposal and quotation.
As a Premier Cable Machine Manufacturer, Hongkai helps customers with capacity matching calculations at this stage. Front-end equipment (fiber optic coloring line, loose tube line) runs very fast, while back-end equipment (SZ stranding line, fiber optic cable sheathing line) runs much slower. If you buy one of each, the front end has excess capacity and the back end is insufficient. Hongkai helps customers calculate this clearly, avoiding the problem of “each machine meets the standard, but the line doesn’t run smoothly.”

Stage 2: Proposal Confirmation and Contract Signing – Put the Details in Writing
Time: 1 to 2 weeks
After the proposal is confirmed, the contract negotiation stage begins. Hongkai confirms with the customer, item by item:
-
Equipment configuration list: Models, quantities, and core component brands for the entire fiber optic cable making machine series
-
Factory inspection standards: SZ stranding line pay-off tension fluctuation ≤ ±0.5 N, fiber optic cable sheathing line concentricity ≥ 98% – written into the contract, so customers can re-measure after receiving the equipment
-
Delivery lead time: Complete line from contract to factory release in 45 to 60 days
-
Installation and commissioning: Engineers on-site – 12 to 18 days from unpacking to producing the first qualified reel
-
Training: Three levels – operational, maintenance, and data
-
Spare parts: Standard wear-parts kit shipped with equipment, DHL delivery within three days
-
Certification and documentation: CE technical documentation, bilingual operation manuals (Chinese/English), electrical schematics, PLC program backup USB drive
Once the contract is signed and the customer pays the deposit, Hongkai begins production scheduling.

Stage 3: Equipment Manufacturing and Factory Inspection – Let the Data Speak
Time: 45 to 60 days
During the manufacturing stage, multiple machines are being machined and assembled simultaneously in Hongkai’s workshop. The fiber coloring machine assembly line, the SZ stranding line differential gearbox assembly, the fiber optic cable sheathing line extruder commissioning – each unit is manufactured in parallel to shorten the final assembly cycle.
Before leaving the factory, every machine undergoes load testing – feeding actual tubes and sheath material, simulating real production conditions. The data collected is recorded in the factory test report:
-
Fiber coloring machine: Pay-off tension accuracy ±0.05 N
-
Secondary coating line for optical fiber / loose tube line: Excess length control accuracy ±0.2‰
-
SZ stranding line: Pay-off tension fluctuation ≤ ±0.4 N, stranding pitch deviation ≤ ±0.08 mm
-
Fiber optic cable sheathing line: Concentricity ≥ 98.6%, wall thickness tolerance ≤ 0.04 mm
-
FTTH optical cable manufacturing machine and indoor optical fiber production line also come with measured data
Customers can send technical personnel to the Hongkai factory to participate in FAT (Factory Acceptance Test), or watch remotely via video.
Stage 4: Packaging, Shipping, and Customs Clearance – Equipment Arrives Safely at Port
Time: 7 to 40 days by sea (depending on destination)
After manufacturing is complete, the packaging and shipping stage begins. The main unit of the SZ stranding line is packed in a framed wooden crate, wrapped internally with moisture-proof film. The extruder, cooling trough, and capstan of the fiber optic cable sheathing line are packed in separate crates. The fiber coloring machine and secondary coating line for optical fiber are packed whole in wooden crates.
Desiccant is placed inside electrical cabinets, and cabinet doors are sealed with moisture-proof film. Machined metal surfaces are coated with anti-rust oil and wrapped in VCI anti-rust bags. Precision sensors are individually packaged with desiccant inside.
Hongkai supports various trade terms including FOB, CIF, and EXW, flexibly selected according to customer needs. Equipment departs from Guangzhou Nansha Port or Shenzhen Yantian Port. Shipping times: Southeast Asia 7–15 days, Middle East 20–30 days, Africa 25–40 days, Europe 30–40 days, North America 20–30 days.

Stage 5: Installation, Commissioning, and Training – Production in 12 to 18 Days
Time: 12 to 18 days
After the equipment arrives at port, the customer clears customs and transports it to the factory. Hongkai engineers arrive on-site at the same time and begin installation and commissioning:
Step 1: Unpacking inspection. Verify against the packing list and check for transport damage.
Step 2: Mechanical installation. According to layout drawings, determine the position of each unit. The extruder, cooling trough, capstan, and take-up of the fiber optic cable sheathing line must be on the same centerline, with deviation not exceeding 2 mm.
Step 3: Electrical wiring. Check wire by wire against the electrical schematic. Every wire has a number label.
Step 4: Dry commissioning. Each unit runs individually with power on – check the pay-off stand, dancer, stranding unit, and take-up.
Step 5: Load commissioning. Feed tubes and sheath material for real production. The pay-off tension fluctuation of the SZ stranding line is controlled within ±0.5 N, and the concentricity of the fiber optic cable sheathing line reaches 98% or above.
Step 6: Linked commissioning. The entire fiber optic cable production line runs in series – fiber coloring machine → secondary coating line for optical fiber → loose tube line → SZ stranding line → fiber optic cable sheathing line – with speed matching and signal communication between units.
Step 7: Operator training. Hongkai engineers train the customer’s operators, electricians, and mechanics. Operational level (startup, changeover, parameter adjustment), maintenance level (common troubleshooting, spare part replacement), and data level (data export, MES integration).
Step 8: Acceptance sign-off. The customer measures with instruments: pay-off tension fluctuation, stranding pitch deviation, sheath concentricity. Compare against the factory test report – if the data matches, sign off on acceptance.
Before the engineers leave, ensure operators can independently complete a changeover. Training for the FTTH optical cable manufacturing machine and indoor optical fiber production line follows the same standard.
Stage 6: Production and Ongoing Support – Equipment “Supported for Life”
After production begins, Hongkai provides remote video support with a 2-hour response time during working hours. Equipment can optionally be equipped with a remote access module (with customer authorization), allowing engineers to remotely view equipment operating status and diagnose alarm causes. In 2024, Hongkai completed 89 overseas remote video support sessions, with an average resolution time of 32 minutes.
Spare parts are shipped via DHL, arriving in 3 to 5 working days. Major electrical components use Siemens/Mitsubishi/Schneider, with global warranty coverage and locally available replacements. Every machine comes with a standard wear-parts kit – belts, bearings, sensors, fuses – shipped with the equipment.
One Table to Understand: What Happens at Each Stage, from Inquiry to Production
| Stage | Time | What the Customer Does | What Hongkai Does |
|---|---|---|---|
| Inquiry confirmation | 1–5 days | Specify product type, factory location, capacity target | Provide configuration proposal and quotation |
| Contract signing | 1–2 weeks | Confirm configuration, delivery time, service scope | Schedule production, prepare materials |
| Equipment manufacturing | 45–60 days | Can send personnel for FAT or watch remotely | Manufacture, load test, factory inspection |
| Packaging and shipping | 7–40 days | Clear customs, transport to factory | Package, ship, provide customs documents |
| Installation and commissioning | 12–18 days | Cooperate with installation, receive training | Engineers on-site for installation, commissioning, training |
| Production support | Ongoing | Daily operation and maintenance | Remote support, spare parts shipping, retraining |
📩 Get Your Customized Cable Production Line Configuration Proposal
If you are procuring a fiber optic cable production line for an overseas project, or want to learn what equipment Hongkai can provide as a Premier Cable Machine Manufacturer, feel free to contact the Hongkai technical team.
Just tell us three things:
-
What type of cable do you want to make? (Loose-tube / FTTH / indoor cable)
-
Where will the factory be built? (This affects voltage system and certification requirements)
-
Approximately what capacity? (How many kilometers per month or per year)
We will provide a preliminary equipment configuration proposal and quotation within 5 working days.