First Startup Guide for Cable Factories: From Unpacking to Cable Output – Eight Steps You Can’t Skip
The equipment has arrived at port, the factory is ready, and the power is connected – now what?
Many overseas customers feel most anxious about the “first startup” after a fiber optic cable production line arrives at their factory. Will the equipment run? Are the parameters correct? Will it alarm as soon as it’s powered on?
Today, using an SZ stranding line and a fiber optic cable sheathing line as examples, let’s walk through the eight steps of first startup. Following this process, from unpacking to producing the first qualified reel of cable typically takes 12 to 18 days.